Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the cookie-law-info domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gbm/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-cerber domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gbm/wp-includes/functions.php on line 6114
XPO LogisticsCastine-en-Plaine (14) - Groupe Bleu Mercure

XPO Logistics

Castine-en-Pleine (14)

XPO Logistics s’installe à Castine-en-Plaine (14).
Après 8 mois de chantier, le Groupe Bleu Mercure livre une plateforme de 3 200 m² à Castine en Plaine (14), commune de l’agglomération caennaise. Cette plateforme en crossdock de 3200 m² environ de surface plancher est implantée sur un terrain d’environ 23000 m² au cœur d’une zone d’activités. XPO LOGISTICS, géant mondial du transport, exploitera le site pour une activité de transport palettisé.
Partager sur :

Nature du projet :

Construction - Montage investisseur bailleur

Type de bâtiment :

Plateforme logistique

Nombre de m² :

3 173 m²

Localisation :

Castine-en-Pleine (14)

Occupant :

XPO Logistics

XPO Logistics - Castine en Plaine / Caen
XPO Logistics - Castine en Plaine / Caen
XPO Logistics - Castine en Plaine / Caen