Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-cerber domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gbm/wp-includes/functions.php on line 6114
Chronopost Narbonne (11) - Groupe Bleu Mercure

Chronopost

Narbonne (11)

Construction d’une plateforme logistique à destination de Chronopost
Chronopost a fait appel au Groupe Bleu Mercure dans le cadre d’un montage locatif à Narbonne.
Partager sur :

Nature du projet :

Plateforme Logistique

Type de bâtiment :

Bâtiment de messagerie

Nombre de m² :

2 570 m²

Localisation :

Narbonne (11)

Occupant :

Chronopost

Chronopost - Narbonne (11)
Chronopost - Narbonne (11)
Chronopost - Narbonne (11)