Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the cookie-law-info domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gbm/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-cerber domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gbm/wp-includes/functions.php on line 6114
DHL Bourgbarré (35) - Groupe Bleu Mercure

DHL Bourgbarré

Bourgbarré (35)

Construction d’un bâtiment de messagerie pour le compte de DHL Freight.
Situé sur l’axe Rennes-Angers, au sein de la métropole rennaise, ce nouveau site s’inscrit dans la stratégie de développement de DHL, répond à leurs besoins et intègres toutes les nécessités de leur process. L’ensemble immobilier se compose d’une partie bureaux, d’un entrepôt équipé de 28 quais et d’un espace de stockage extérieur. Sur ce projet, la Foncière Bleu Mercure a eu un rôle d’investisseur bailleur. Tout au long de sa mission d’assistance à maîtrise d’ouvrage, Bleu Mercure Ingénierie a accompagné la Foncière de la phase avant-projet à la livraison de la plateforme.
Partager sur :

Nature du projet :

Plateforme

Type de bâtiment :

Bâtiment de messagerie

Nombre de m² :

2 374 m² (entrepôt 2 024 m² + bureaux 350 m²)

Localisation :

Bourgbarré (35)

Occupant :

DHL Freight

DHL Bourgbarré (35)
DHL Bourgbarré (35)
DHL Bourgbarré (35)