Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the cookie-law-info domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gbm/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-cerber domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gbm/wp-includes/functions.php on line 6114
DHL Ennery (57) - Groupe Bleu Mercure

DHL

Ennery (57)

Construction d’une plateforme logistique à destination de DHL Freight
DHL Freight a fait appel au Groupe Bleu Mercure dans le cadre d’un montage locatif à Ennery. L’actif se trouve au sein de la ZAC Eurotransit zone logistique de l’axe Metz Thionville, à 16 km de Metz.
Partager sur :

Nature du projet :

Plateforme logistique

Type de bâtiment :

Bâtiment de messagerie

Nombre de m² :

1 305 m²

Localisation :

Ennery (57)

Occupant :

DHL Freight

DHL Ennery (57)
DHL Ennery (57)
DHL Ennery (57)