Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the cookie-law-info domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gbm/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-cerber domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gbm/wp-includes/functions.php on line 6114
France Boissons Gerzat (63) - Groupe Bleu Mercure

France Boissons

Gerzat (63)

Construction d’une plateforme logistique à destination de France Boissons
France Boissons a fait appel au Groupe Bleu Mercure dans le cadre d’un montage locatif à Gerzat, département du Puy-de-Dôme.
Partager sur :

Nature du projet :

Plateforme logistique

Type de bâtiment :

Bâtiment de stockage

Nombre de m² :

6 044 m²

Localisation :

Gerzat (63)

Occupant :

France Boissons

France Boissons - Gerzat (31)
France Boissons - Gerzat (31)
France Boissons - Gerzat (63)